Job:         St David’s Cathedral – Pembrokeshire
Client:    Des Harries Construction Ltd
Dates:    July 2016

Following numerous projects at St Davids’, iBEX were approached by Des Harries Construction to carry out a detailed inspection of the main tower at the Cathedral using rope access and a subsequent survey of the high level areas using a MEWP.

  • Using internal stairs to access the tower roof the team were able to set up ropes in order to survey the tower
  • During the rope access survey of the spire loose materials were removed, making the area safe
  • iBEX also provided a tracked MEWP and IPAF qualified operator to carry out inspections of the lower level structures
  • The tracked MEWP was placed on load spreading boards when working on soft ground
  • Following the inspections, a detailed photographic report was issued to the client